Evaluation at the World Bank

Social and environmental concerns

Throughout the period from 1972 to 1989, the Bank did not conduct its own environmental assessments and did not require assessments for every project that was proposed. Assessments were required only for a varying, small percentage of projects, with the environmental staff, in the early 1970s, sending check-off forms to the borrowers and, in the latter part of the period, sending more detailed documentation and suggestions for analysis.

During this same period, the Bank’s failure to adequately consider social environmental factors was most evident in the 1976 Indonesian Transmigration program (Transmigration V). This project was funded after the establishment of the Bank’s OESA (environmental) office in 1971. According to the Bank critic Le Prestre, Transmigration V was the “largest resettlement program ever attempted... designed ultimately to transfer, over a period of twenty years, 65 million of the nation’s 165 million inhabitants from the overcrowded islands of Java, Bali, Madura, and Lombok...” (175). The objectives were: relief of the economic and social problems of the inner islands, reduction of unemployment on Java, relocation of manpower to the outer islands, the “strengthen[ing of] national unity through ethnic integration, and improve[ment of] the living standard of the poor” (Le Prestre 175).

Putting aside the political aspects of such a project, it otherwise failed as the new settlements went out of control; local populations fought with the migrators and the tropical forest was devastated (destroying the lives of indigenous peoples). Also, “[s]ome settlements were established in inhospitable sites, and failures were common;” these concerns were noted by the Bank's environmental unit whose recommendations (to Bank management) and analyses were ignored (Le Prestre, 176). Funding continued through 1987, despite the problems noted and despite the Bank’s published stipulations (1982) concerning the treatment of groups to be resettled.

More recent authors have pointed out that the World Bank learned from the mistakes of projects such as Transmigration V and greatly improved its social and environmental controls, especially during the 1990s. It has established a set of "Safeguard Policies" that set out wide ranging basic criteria that projects must meet to be acceptable. The policies are demanding, and as Mallaby (reference below) observes: "Because of the combined pressures from Northern NGOs and shareholders, the Bank's project managers labor under "safeguard" rules covering ten sensitives issues...no other development lender is hamstrung in this way" (page 389). The ten policies cover: Environmental Assessment, Natural Habitats, Forests, Pest Management, Cultural Property, Involuntary Resettlement, Indigenous Peoples, Safety of Dams, Disputed Areas, and International Waterways

0 komentar: